Every new schedule dropped in the folder is read and compared automatically against the baseline and against the schedule before it. Pick any of those reports from the Reports list at the top.
The schedule you are measuring against on the left, the one the GC just issued on the right. PDF from P6, MS Project, Outbuild or Planera, or the native export (.xer, Excel, CSV). Drop a file on a box or tap it.
How many electrical activities are open at once. A taller, narrower current curve means the same work stacked into less time — more crews at once.
Cumulative share of electrical activities complete by month end. The gap between the curves is time lost.
Click a row to change how it is paired, leave it out of the letter, or add a dated photo or note. Fuzzy pairings and outliers are marked check — look at those before sending.
Internal only — this never goes in the GC letter. It shows on the PM report so the PM can decide whether to price a COR.
Built from the comparison and Ops's notice paragraphs. Edit the fields on the left; the letter on the right updates as you type. Download Word to edit further, or print to PDF.